Shutter Replacement Update 5

March 11, 2015

Dear Regency Residents:

 

Today, rigging was installed on stacks 04, 03, & 02, on both buildings.   In preparation of project commencement, everything will be ready to go.

 

Mike (Expert) has  been assured by Safway,  the necessary safety sign-offs by the Safway engineer, will be in Expert's possession prior to 8am tomorrow, Tuesday, March 10th.  

 

Once Mike has the safety releases, the Expert crew will remove shutters on the 06 stack in Building #1, while at the same time, take measurements of each 05 balcony; Building #1 only tomorrow. 

 

Sincerely,

Pat

Please reload

Featured Posts

May 28, 2019 Island Dunes Country Club Announcement

2019 IDCC Schedule

May 28, 2019

1/2
Please reload

Recent Posts
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
Follow Us

I'm busy working on my blog posts. Watch this space!

Please reload

Search By Tags

May 20, 2020

January 6, 2020

Please reload

© 2014 by The-Regency.com Proudly created with Wix.com

  • Facebook Classic
  • Twitter Classic
  • YouTube Classic
  • Flickr Classic