Shutter Replacement Update 5

Dear Regency Residents:

Today, rigging was installed on stacks 04, 03, & 02, on both buildings. In preparation of project commencement, everything will be ready to go.

Mike (Expert) has been assured by Safway, the necessary safety sign-offs by the Safway engineer, will be in Expert's possession prior to 8am tomorrow, Tuesday, March 10th.

Once Mike has the safety releases, the Expert crew will remove shutters on the 06 stack in Building #1, while at the same time, take measurements of each 05 balcony; Building #1 only tomorrow.

Sincerely,

Pat