Shutter Update # 46

May 6, 2015

BUILDING #1 

CROSSOVER TO THE POOL IS CLOSED from 8:AM to 4:30PM, Monday - Friday due to construction starting on the 01 STACK.  PLEASE USE THE GROUND LEVEL EXIT WHEN GOING TO THE BEACH OR POOL AREA DURING THIS TIME. 

 

PLEASE DO NOT PLACE ITEMS ONTO YOUR EAST SIDE BALCONY IF YOU HAVE NOT RECEIVED A NOTICE THAT IT IS SAFE TO DO SO. 

 

RID / ESS FINAL INSPECTION    

ESS & RID inspections include closing, locking, and re-opening every set of shutters, in addition to checking caulking, fasteners, and cleanliness. 

   

SLC FINAL INSPECTIONS / SIGN OFF - the Final Inspection of each set of shutters by SLC is being coordinated per stack rather than several units at a time.  Inspections are scheduled throughout the week of May 4th. If you are in residence, you will be notified when the inspector and Regency Staff will inspect your shutters. 

 

Definitions 

Taken down:  This means when shutter blades & tracks are no longer installed on your balcony.

Removed:  This means when old shutters are taken off of your balcony.  Old shutters will be removed from each balcony when new shutters are placed for installation.

 

PLEASE DIRECT ALL PROJECT RELATED QUESTIONS TO THE MANAGEMENT OFFICE OR CALL PAT'S CELL PHONE 772-201-1466

 

Building #1:

06 stack - CLEARED FOR FURNITURE & SAFE USE OF EAST BALCONY

~~~furniture & other misc items can safely be returned to the east side balcony in Bldg #1, stack 06

~~~SLC FINAL INSPECTIONS - mostly complete

05 stack  

~~~PH5 - LN5 - ready for SLC to sign off

04 stack 

~~~PRESSURE WASHING THE 04 BALCONY STACK IS SCHEDULED FOR THIS WEEK WHEN ALL TILE WORK IS COMPLETE.

~~~RID / ESS final inspection completed May 1st

~~~PH4 shutter installation complete

~~~1204 shutter installation complete

~~~1104/03 tile replacement 98 % complete / inspection May 6th.

~~~1004 shutter installation complete / tile delivered for repair in center of balcony

~~~904 shutter installation complete

~~~804 shutter installation complete

~~~704 shutter installation complete / tile grout touch up - inspection May 7th.

~~~604 shutter installation complete

~~~504 shutter installation complete

~~~404 shutter installation complete 

~~~304 shutter installation complete

~~~LN4 shutter installation  complete

03 stack 

~~~PH3 shutter installation complete

~~~1203 shutter installation complete

~~~1103/04 tile replacement 98% complete / inspection May 7th.

~~~1003 shutter installation complete

~~~903 shutter installation complete

~~~803 shutter installation complete

~~~703 shutter installation complete

~~~603 shutter installation started

~~~LN3 shutter installation complete

02 stack  

~~~Thursday, May 7th - old shutter removal / new shutter placement 1002 - PH2

~~~602 - 902  shutter removal / new shutter placement

~~~LN - 5 old shutter removal / new shutter placement

~~~PH - LN JB completed all stucco, patching and painting 

~~~702 tile trough repair started (waterproof membrane down) May 1st; fill in / leveling the week of, May 4th.

01 stack 

~~~LN shutter take down complete

~~~301 shutter take down complete

~~~401 shutter take down complete

~~~501 shutter take down complete

~~~601 shutter take down 75% complete

 

Building #2:

06 stack 

~~~SLC FINAL INSPECTIONS - mostly complete

05 stack -

~~~RID / ESS final inspection completed April 29th.

~~~PH5 shutter installation complete

~~~1205 shutter installation complete / inspection May 7th

~~~1105 shutter installation complete

~~~1005 shutter installation complete

~~~905 shutter installation complete

~~~805 shutter installation complete

~~~705 shutter installation complete

~~~605 shutter installation complete

~~~505 shutter installation complete

~~~405 shutter installation complete

~~~305 shutter installation complete

~~~LN5 shutter installation  complete

04 stack 

~~~ready for SLC sign off

~~~RID / ESS final inspection completed April 29th.

03 stack

~~~PH3 shutter installation complete

~~~1203 shutter installation complete

~~~1103 shutter installation complete

~~~1003 shutter installation complete

~~~903 shutter installation complete

~~~803 shutter installation complete

~~~703 shutter installation complete

~~~603 shutter installation 75% complete

~~~LN3 shutter installation complete

02 stack

~~~LN2 take down completed

~~~302 take down completed / old shutters removed for tile work

~~~402 take down complete / missing tile repair approx 1.5" X 15"

~~~502 take down complete

~~~602 take down complete

~~~702 take down complete

~~~802 take down complete

~~~902 take down complete

~~~1002 take down complete

~~~1102 take down complete

~~~1202 take down complete

~~~PH2 take down complete

01 stack

~~~LN1 take down 95% complete

~~~301 take down 95% complete

~~~401 take down 95% complete

 

 

 

PVC has been placed into all 01, 02, 03, 04, 05 and 06 slider tracks to remind guests, realtors, and even residents, not to use the east side balcony. 

 

NOTE CHANGE:  Walt is assigned to Building #1 and Dave is assigned to Building #2 to check areas for security, cleanliness, and safety daily, throughout the project. 

 

If you notice anything which warrants attention after hours, please call Security ASAP. 

Please reload

Featured Posts

May 28, 2019 Island Dunes Country Club Announcement

2019 IDCC Schedule

May 28, 2019

1/2
Please reload

Recent Posts
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
Follow Us

I'm busy working on my blog posts. Watch this space!

Please reload

Search By Tags

May 20, 2020

January 6, 2020

Please reload

© 2014 by The-Regency.com Proudly created with Wix.com

  • Facebook Classic
  • Twitter Classic
  • YouTube Classic
  • Flickr Classic