Emergency Water Shut-Off Building 1

BUILDING #1 WATER OFF FOR EMERGENCY CONTROL VALVE REPLACEMENT

DECEMBER 9TH at 8:AM - 4:PM

Next Wednesday, December 9th, all domestic water will be off to Building #1 for emergency control valve replacement to each of the six stacks.

Beginning at 8AM through approximately 4PM, water will be shut off, the entire building drained, and a new valve installed for each stack (01-06).

This past Friday, the valve that controls water to the 06 stack failed and Jupiter Plumbing was able to jerry rig it while new valves are being obtained.

Building #1's six control valves are the same age. All six are being replaced in one day at a considerable savings and minimum inconvenience to residents.

Thank you in advance for your cooperation and always feel free to contact the office with any questions.

Sincerely,

Pat


Featured Posts
Recent Posts
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
Follow Us
No tags yet.
Search By Tags